by Matt Gore | Jun 22, 2022
This was a full bathroom refurbishment. We removed the existing fixtures and wall tiling and replaced with modern, stylish fixtures that totally transform the look and feel of this...
by Matt Gore | Oct 22, 2021
We installed a replacement boiler and new flooring. We also refurbished thedownstairs WC and redecorated the hall stairs & landing. This replacement boiler was installed by a gas safe registered engineer. What our client said: Phase 3 complete, all bar a...
by Matt Gore | Aug 16, 2021
This replacement boiler was installed by a gas safe registered engineer. We also replace gas hobs and...
by Matt Gore | Aug 16, 2021
by Matt Gore | Aug 16, 2021
Once the stud work had been erected we ran electrical wiring and added insulation for heat retention and sound deadening and fitted electrical sockets to the finished plasterboard. We finished with architrave, skirting board, safety glass & a paint...